TAM Parts Installation
Below is a typical rail removal and installation at TAS |
After removing the engine, the compartment is cleaned. The placement of the old rail is marked with a jig, to ensure proper relocation of the new rail.
|
The defective rail is then removed, the jig remains in place.
|
The new rail is then installed and lined up with the jig.
|
The rail and panels are clecoed and clamped into place.
|
The new rail is then riveted into place.
|